Beiträge für April 2, 2017
Digging out the old floor

27.02.17 – 03.03.17 after 2 weeks of business holidays we are digging out more of the old floor to gain

April 2, 2017
We install the roof tiles

31.01.17 – 10.02.17 installation of the roof tiles  in madeira the fix the lowest and the top roof tiles with

April 2, 2017
2014 JamSession © All rights reserved.